Electricity Temporary Disconnection
what is electricity temporary disconnection and TD is done. in uppcl and Uttar Pradesh electric line disconnection on what base.
what is electricity temporary disconnection and TD is done. in uppcl and Uttar Pradesh electric line disconnection on what base.
If the meter got defective in a month and the reader wants to make the bill, then the bill has to create on an IDF bill basis.
contracted load in the domestic connection is assumed to be 50% of the connected load.