Online electricity bill revision calculator UPPCL

BILL REVISION OF DOMESTIC (LMV-1) BILL UP TO 10 KW CAN BE DONE BY JUNIOR ENGINEER

Bill revision of Domestic Light-Fan Connection (LMV-1) bills up to 10 KW to the can be done by junior Engineer (Distribution) with the approval of the concerned Sub Divisional Officer on the on-line billing system. in this post attached letter has an order copy describing it. and also in Hindi order is mentioned below.

HOW TO DO BILL REVISION

Suppose the consumer meter gets damaged/lost or showing no display due to which bill is made on IDF bill basis. Then, for bill revision, we would need to take average consumption for three-month consumption but the average must be of the same season because consumption varies from season to season.

The Procedure of Bill Revision in case of Damaged/Lost meter

  1. The Consumer will be billed for the period between the date of the last ok reading and installation of the new meter. the revised bill will be made based on the average consumption and average maximum load of three previous billing cycles before the last reading-based billing. If in between a provisional bill was made then, that provisional bill amount shall be accordingly deducted from the final revised bill.
  2. if due to any reason the recorded consumption of the past three billing months before the date damage/Lost of meter is not available or available but partially, then the consumption pattern Shall be taken from an average consumption of new meter installed against the damage / lost meter.
  3. while calculating the average consumption of three months, the season also should be taken into consideration. because consumption varies from season to season. So three-month average consumption should be taken of that season, in which month, this meter was damaged.

उत्तर प्रदेश पावर कारपोरेशन लिमिटेड
(उत्तर प्रदेश सरकार का उपक्रम)
U.P. POWER CORPORATION LIMITED
(Govt. of Uttar Pradesh Undertaking)
CIN:U32201 UP1999SGC024928
“संख्या-648-कार्य/चौदह/पाकालि/2018-4-के/2018
दिनांक: 20 फरवरी, 2018
कार्यालय ज्ञाप
निदेशक मण्डल, उ0प्र0 पावर कारपोरेशन लि0 द्वारा परिचालकीय विधि से दिनांक 17.02.2018 को प्राप्त
अनुमोदन के उपरान्त पूर्व में निर्गत कार्यालय ज्ञाप सं0-345-कार्य/चौदह/पाकालि/2018-4-के /2018 दिनांक 22.
01.2018 को अवक्रमित करते हुए अवर अभियन्ता (वितरण) को 10 किलोवाट तक के घरेलू बत्ती-पंखा संयोजन
(एल0एम0पी0-1) के बिलों को ऑन-लाइन बिलिंग सिस्टम पर सम्बन्धित उपखण्ड अधिकारी के अनुमोदन से संशोधित
करने का अधिकार एतद्वारा प्रदान किया जाता है।”